Contract for preparatory works for the construction of the AZUR 2 building.
The CEA plans to build a new facility within the INBS-PN of Cadarache, AZUR 2. In order to guarantee the perfect preparation of the chosen site, the CEA wishes, through the contract covered by this opinion, to carry out the preparatory work necessary for the development of the construction area.
These works correspond to the following services:
- diversion of existing networks,
- earthworks with storage or disposal of excavated material,
- construction of networks (CFO, CFI, drinking water, wastewater), roads and a rainwater management basin.