The purpose of this framework agreement is to carry out field visits to evaluate the technical conditions of connection to the public electricity distribution network and this within the framework of the instruction of the acts or certificate of town planning, the establishment of an urban planning document (rain, rain, communal map ...) or outside planning fields.
The studies and the realization of work of connection to the public electricity distribution network mainly by the underground technique including the extension proper allowing the realization of a project of individual and / or collective connection.
The eventual reinforcement of the network caused by the need for extension.
The construction of a civil engineering for public lighting networks, telecommunications that may be associated with this work without this being systematic.
The installation of recorders relating to the quality of public distribution of electrical energy.
This lot concerns the services to be performed on the geographical area of Bessin-Bocage. Estimated annual, non-contractual, annual amount: from EUR 250,000 to EUR 1,000,000.
This lot concerns the services to be performed on the geographical area of Caen la Mer and its surroundings - Norman Switzerland and Falaise Country. Estimated amount, excluding annual non-contractual VAT: from 250 000 to 1 000 000 EUR.
This lot concerns the services to be performed in the geographical area of Pays d'Auge Nord and Pays d'Auge Sud. Estimated amount, excluding annual non-contractual VAT: from 250 000 to 1 000 000 EUR.