Energy efficiency complex project: low-CO2 district heating supply of the future - transformation of the district heating network in Pirna
Lot 2.2: dismantling of 38 existing FW house connection stations; Delivery, installation and commissioning of 38 new FW house connection stations.
- Replacement of 38 compact district heating stations, indirect connection, TWWB 2-stage in the flow principle, RL cooling from the primary-side heating RL, connected load 92-570 kW;
- Connection to the existing DH supply, building heating system, hot and cold water distribution, circulation;
- approx. 1 000 running meters Pipelines including insulation:
- Fire protection safety measures, such as the setting up of fire guards, supervision of the construction site, etc., are to be provided and included in the unit prices. The work must be organized in such a way that no additional fire watch outside the contractor's working hours are required.