The water association Peine, hereinafter referred to as AG, intends to announce the cleaning and visual inspection of sewer networks in the villages of Soßmar, Mehle, Wülfingen and Gross Himstedt.
Cleaning and visual inspection of the sewer system SossmarThe following cable lengths are available: SW pipes 4,960 m, RW pipes 4,075 m, SW shafts 110 pcs, RW shafts 135 st, SW lines 3,350 m, RW lines 3,050 m, SW house connection control shafts 220 st, RW house control shafts 140 h
Cleaning and visual inspection of sewer network floursThe following cable lengths are available: SW pipes 540 m, GL pipes 1,490 m, MW pipes 7,430 m, SW shafts 15 pcs, RW shafts 45 st, MW shafts 195 h, SW lines 420 m, RW lines 2,080 m, MW lines 4,440 m, SW house connection control shafts 35 hours, RW house connection control shafts 35 St, MW house connection control bays 290 pcs
Cleaning and visual inspection of the Wülfingen sewer networkThe following cable lengths are available: SW pipes 5,650 m, GW pipes 5,060 m, SW shafts 170 St, RW shafts 180 St, SW lines 3,540 m, RW lines 3,410 m, SW house connection control shafts 235 St, RW house connection control shafts 145 pcs
Cleaning and visual inspection of the Groß Himstedt sewer networkThe following cable lengths are available: SW pipes 4,405 m, RW pipes 5,575 m, SW shafts 130 pcs, RW ducts 160 St, SW lines 2,400 m, RW cables 2,775 m, SW house connection control shafts 160 St, RW house connection control shafts 105 pcs