Bundesstraße 4 runs between Braunschweig and Gifhorn through the towns of Meine and Rötgesbüttel. In the future, these two places are to be relieved of through traffic by a four-lane bypass. In the course of this, 3 buildings (BW 05Ü, BW 13Ü and BW 15Ü) are to be built.
BW 05Ü: Bridge in the course of the Rodeweg (fauna bridge) over the B4
BW 13Ü: Bridge in the course of Kampstraße over the B4 and the railway line (DB AG VzG 1902) with
Simultaneous transfer of a green strip
BW 15Ü: Bat Passage
Irritation protection walls are planned on both sides of all three buildings. The planning of the irritation protection walls are not part of this planning order. Further information and details can be found in the site plans (see Annexes 5 to 7).
The underpassed B4 (new) tracks the control cross-section RQ21 in accordance with the guidelines for the construction of country roads in the sections under consideration.
The total costs of the construction project amount to an estimated 5.00 million euros (gross).
1. Object planning Civil engineering structures:
1.1 BW 05Ü
LPH 1-3, 6 partially according to § 43 HOAI
1.2 BW 13Ü
LPH 1-3, 6 partially according to § 43 HOAI
1.3 BW 15Ü
LPH 1-3, 6 partially according to § 43 HOAI
2. Specialist planning of structural engineering:
2.1 BW 05Ü
LPH 2, 3 and 6 partly according to § 51 HOAI
2.2 BW 13Ü
LPH 2, 3 and 6 partly according to § 51 HOAI
2.3 BW 15Ü
LPH 2, 3 and 6 partly according to § 51 HOAI