The Evangelische Hochschule Berlin is being energetically renovated. This is a listed building complex, which consists of a total of six houses (A to F). The SFIVET's teaching and administration rooms are located in the buildings. During the renovation work, the university is fully operational.
1000 m² covers, 100 m² dust protection wall, 100 m² plasterboard sheathing, 60 m² facing shell, 30 m² shaft wall, 155 m² plasterboard ceilings, aprons, openings, inspection flaps, cutouts, adjustments to ceiling constructions in the Audimax including measurement and detailed planning, consisting of 450 mounting rails on steel beams, 48 ceiling sails smooth sheet with mineral wool overlay including lamp cutouts, 60 m adaptation of existing rabit wall with wood paneling, 280 m long span beams suspended, 120 m² cantilevered plasterboard ceiling, mineral wool overlay, apron, corner formations, adaptation to existing construction, 112 m² interior insulation with mineral insulation boards and plaster, coating, End edges, 1 self-supporting room system, 1 fire protection curtain, 310 m² fire protection cladding of steel beams/roof support construction, fire protection cladding of 450 mounting rails and 1000 ceiling hangers for suspended ceilings, execution in construction stages