The contract includes separate sewerage of existing communal sewerage located in Stige Vest
comprising approx. 230 properties, by the construction of a new 2-strand drainage system and new service lines for affected
Properties.
The contract includes separate sewerage of existing communal sewerage residential area located in Stige
West comprising approx. 230 properties, by the construction of a new 2-string drainage system and new service lines for
affected properties. In carrying out the contract, controlled boreholes must also be used at
the pilot tube method and microtunneling. The project also includes the establishment of 2 new pumping stations with
associated pressure line and the establishment of a sand trap basin of 7500 m3.
The contract broadly includes the following:
• Establishment of approx. 3600 m ø200mm wastewater pipe with associated wells, primarily located in road area
• Establishment of approx. 3850 m ø200 – ø1000mm rainwater pipe primarily located in dob-belt pit with
spildevandsledning.
• Establishment of approx. 360 m ø200 – ø800 mm controlled boreholes at the pilot tube method and
microtunnelering.
• Establishment of ø110 wastewater plugs with boundary wells for all properties
• Establishment of ø110 mm rainwater plugs for all properties excluding the properties that exhaust with rainwater.
• Etablering af ca. 200 m ø110 mm PE PN10 trykledning
• 75 pcs Ø600 mm plastbrønde
• 59 pieces Ø1250 mm concrete brønde
• Establishment of 2 construction pits as dense sheet piling for new pump well
• Establishment of sending pit and receiver pit for microtunneling
• Establishment of 4 sending pits and 4 receiving pits for pilot pipe drilling
• Setting of 2 ø2000 pump wells (client delivery)
• Replacement of road wells and service lines
• Establishment of a sand trap pool of 7500 m3
• Establishment of hilly landscape
• Restoration of coatings
• Restoration of curbs and sidewalks over service lines