New construction of a fire station in Bindlach
Sanitary installation: approx. 43 m PE sewage pipes, c cleaning system compressed air system
Heating installation: 1 gas boiler 80 kW, 2 air heat pumps 30 kW, approx. 860 m pipeline, 29 pieces of radiant ceiling panels, 62 pieces
Radiant ceiling panels 62.5x62.5 mm, 235 m² underfloor heating, cold room 2.10 x 2.10 x 2.41 m
Ventilation installation: Ventilation system with heat recovery system, 4500 m³/h, 80 m air ducts
Electrical installation: 1 meter distribution, 8 sub-distributions, approx. 10,000 m of cables, KNX installation, 315 pieces of LED lights, 53 pieces
Wireless smoke detector, emergency lighting, PV system 29 kWp, 44 electronic double knob cylinders,
Compressed air system: 1 piece of compressed air system ready for operation, fully automatic, super soundproofed, vibration insulated, incl.
Accessories such as transitions, pipe capacities, bends, T-pieces etc., 1 piece of rolling scaffolding
High pressure cleaning: 1 piece hot water high-pressure cleaner incl. all accessories such as stainless steel pipes, bends, T-pieces, hoses etc.,
1 piece of underbody washer, 1 piece of rolling scaffolding