Construction work for buildings relating to health

Contract Value:
EUR 12M - 12M
Notice Type:
Contract Notice
Published Date:
03 August 2021
Closing Date:
24 September 2021
Location(s):
FR105 Hauts-de-Seine (FR FRANCE)
Description:
works for the construction of the House of Health

the work for the construction of the Maison de la santé is broken down into 9 legally separate lots and processed by separate contracts. The duration of each lot starts from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation shall be 24 months from the notification of Lot 1. There is a social scheme designed to promote the employment of persons with difficulties in employment and to combat unemployment (except for Lot 7 - lift). As such, the licensee is asked to reserve tasks up to 5% of the amount of the contract. The estimated amount of the operation is estimated at 12.000.000 euro (incl. VAT)

Earthwork-foundations-large works-geothermal probes-masonrying-sealing-covering-wood-frame walls-facade coverings-exterior joinery-metallerie

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social mechanism designed to promote employment of persons with difficulties of integration and to combat unemployment

partitions - lining - False ceilings

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social mechanism designed to promote employment of persons with difficulties of integration and to combat unemployment

Interior joinery and signage

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social scheme designed to promote employment of persons with difficulties in integration and to combat unemployment.

Floor and wall coverings

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social scheme designed to promote employment of persons with difficulties in integration and to combat unemployment.

Painting

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social scheme designed to promote employment of persons with difficulties in integration and to combat unemployment.

cfo cfa ssi

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social mechanism designed to promote employment of persons with difficulties of integration and to combat unemployment

lifts

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation

cvc - smoke removal - plumbing

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social scheme designed to promote employment of persons with difficulties in integration and to combat unemployment. A mandatory site visit is planned for this batch

roads and various networks - green spaces

the purpose of this consultation is to work on the construction of the Maison de la santé. It is broken down into batches processed by separate contracts. The term of the contract for this consignment begins from the date of notification to its holder and ends at the end of the guarantee of perfect completion. The overall execution period of the operation is 24 months from the notification of Lot 1, including 2 months of construction preparation. There is a social scheme designed to promote employment of persons with difficulties in integration and to combat unemployment.

Download full details as .pdf
The Buyer:
ville de nanterre
CPV Code(s):
45112500 - Earthmoving work
45112710 - Landscaping work for green areas
45215100 - Construction work for buildings relating to health
45223220 - Structural shell work
45232460 - Sanitary works
45233140 - Roadworks
45261210 - Roof-covering work
45262522 - Masonry work
45311200 - Electrical fitting work
45313100 - Lift installation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45421000 - Joinery work
45421141 - Installation of partitioning
45421146 - Installation of suspended ceilings
45432100 - Floor laying and covering work
45432210 - Wall-covering work
45442100 - Painting work