Construction work for swimming pool

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
09 November 2020
Closing Date:
03 December 2020
Location(s):
DE124 Rastatt (DE Germany/DEUTSCHLAND)
Description:
Redesign of the Bühlot outdoor pool in Bühlertal - jumping facilities

Renewal and modernization of the Bühlot outdoor pool in Bühlertal:

After more than 50 years of operation, the outdoor swimming pool built in the 1960s is in need of major renovation and modernization.

The following measures are planned:

- Reduction of the water surface of the existing combination pool from approx. 1,500 square meters to 960 square meters,

- Dismantling of the existing functional building and replacement with a two-part new building with accommodation of the technical systems as well as the changing, sanitary and personnel areas,

- Complete renewal of the water treatment system and the associated piping as well as renewal of the sanitary, heat supply and electrical systems,

- Installation of a stainless steel combination pool in the existing concrete pool,

- complete renovation of the outdoor facilities,

- Installation of a wide wave slide and a new jumping facility (1 m, 3 m, 5 m).

Start of construction: March 1, 2021 Completion: April 15, 2022 Total construction costs (KG 200-600): approx. 5.6 million EUR net.

Jump facilities:

- 1 pc. 1 m jump system made of stainless steel with board,

- 1 pc 3 m jump system made of stainless steel with board,

- 1 5 m stainless steel jump system.

Service period:

- by KW15 2021: provide construction information for the shell,

- by KW16 2021: Submission of the execution drawings,

- from week 43 to week 45 2021: assembly of the jumping facilities.