The existing elementary and regular school is to be brought together on a “campus”. For this reason, a part of the building will be added to the existing regular school. The primary and regular school rooms including administration, canteen, auditorium and other central functions are to be accommodated in this.
Lot 04.2 – PVC windows
Overview of services
PVC windows with aluminium cover shell, 2-fold insulating glazing, integrated sun protection
- 8 pieces 1.35x2.01m, 1-flg.
- 2 pieces 2.01x1.385m, 2-flg.
- 3 pieces 1.01x2.96m, 1-flg.
- 1 piece 1.26x2.51m, 1flg.
- 5 pieces 2.01x2.01m, 2-flg.
- 3 pieces 3.01x2.01, 3-flg.
- 11 pieces 3.01x2.96m, 3-flg.
- 1 piece 4.01x1.385m, 4-flg.
- 40 pieces 4.01x2.01m, 4-flg.
- 1 piece 4.01x2.96m, 4flg.
- incl. window sill mouldings, cover brackets, static calculation, work planning, window sills, maintenance, marking
Execution period: approx. 03 week 2024 to 39 week 2024