A 10, km 191.945 - 193.7000, 8th BA Lot 12 PWC system.
Traffic safety 1 psch:
- Covering the topsoil 15 000 m
- Floor installation 22 000 m
- Soil improvement 10,000 m
- lawn sowing including completion maintenance 15 000 m
- Set up waste bin 30 pieces;
- Set up wire mesh tables 12 pcs .;
- Set up wire mesh benches 12 pieces;
- Set up wire mesh stool benches 12 pcs .;
- Lay seepage line with pipeline 600 m;
- Make DN 300 manifolds 160 m;
- Install street gullies including connecting lines 20 pieces;
- Install DN 1000 manholes 15 pieces;
- Make slotted channels (DN 300) 260 m;
- Establish banquet attachment 250 m
- Create frost protection layer 600 m
- Create layers of frost-resistant material 2 100 m
- Make gravel base courses 16 500 m2;
- Establish asphalt pavements (tramlines, access roads NRS) 8,000 m
- Make concrete ceilings (car parking spaces) 1,600 m
- Make concrete ceilings (truck parking spaces) 5,000 m
- Make pavements (sidewalks) 3,000 m
- set shelves 3 500 m;
- 30 m shaft pavements;
- make pavement strips 250 m;
- Set up EDSP 2.0 80 m;
- Set up the guide post 30 pieces;
- Set up standard traffic signs 20 pcs .;
- Set up signposts 4 hours;
- Apply markings 4 500 m;
- Lay cable protection pipes 700 m.