Screed, waterproofing and tile work.
- construction schedule,
- screed tests,
- measurement of residual moisture,
- surveying work screed and swimming pool,
- participation in batch testing of tiles,
- shot peening for composite screed = approx. 930 m²,
- shot peening of the swimming pools = approx. 831 m²,
- cement screed in basin = approx. 481 m²,
- 2-layer cement screed up to 130 mm = approx. 1,700 m²,
- heating cement screed approx. 80 mm = approx. 30 m²,
- Make recesses in the screed, close in different dimensions = approx. 180 pieces,
- field delimitation joints = approx. 800 m,
- sealing the screed below 45º / 30 * 30 mm = approx. 1 490 m,
- screed reinforcement = approx. 260 m³,
- tensile tests,
- scratch fillings floor / wall of 5-20 mm = approx. 400 m²,
- Cement leveling plaster / swimming pool plaster i. M. 30 mm = approx. 316 m²,
- waterproofing of the screed surfaces (2K cement) = approx. 1 800 m²,
- seal floor drains = approx. 157 units,
- sealing tape insert / seals = approx. 3 029 m,
- wall seals in different heights = 912 m²,
- sealing of wall bushings = approx. 230 pieces,
- sealing pelvis head = approx. 173 m²,
- create a retaining groove / wedge-shaped 30 * 30 mm = approx. 145 m,
- epoxy resin potting / pressure water barrier channel = approx. 145 m,
- epoxy resin potting / storage 30/30 mm = approx. 70 m,
- Epoxy resin potting components = approx. 157 units,
- epoxy resin encapsulation on facade elements = approx. 23 m²,
- Epoxy resin primer on installation parts and sanded = approx. 130 pieces,
- Zurich gutter overflow channel lining = approx. 96 m²,
- overflow gutter stone Zurich gutter = approx. 130 m,
- wall tiles pool = approx. 336 m²,
- allowance for rest step production / tile cladding = approx. 117 m,
- flooring tiles / basin = approx. 468 m²,
- overflow gutter type Wiesbaden gutter = approx. 23 m,
- Design wall tiles in the paddling pool area = approx. 30 m²,
- floor tiles = approx. 1 688 m²,
- wall tiles = approx. 400 m²,
- tile heated bench seats = 60 m²,
- base tiles = 436 m,
- Stairs tiled steps (riser and standing step) = approx. 37 m²,
- movement profiles = approx. 785 m,
- Movement profiles "component joint" = approx. 144 m,
- movement joint sealing = approx. 1 610 m,
- corner protection profiles = approx. 276 m,
- undercut protection = approx. 2,000 m,
- channel gratings = approx. 150 m,
- pure strip entrance = approx. 8 m²,
- Initial cleaning of floor and wall tiles, also basin = approx. 3,670 m²,
- Outdoor swimming pool for non-swimmers: construction site equipment, surveying, inventory, pavilion or the like / overhead covering = 1 x pl 50 mm = approx. 11 m², cement leveling plaster / swimming pool plaster i. M. 30 mm = 27 m², epoxy resin encapsulation pressurized water barrier = approx. 20 m, epoxy resin encapsulation built-in parts approx. 20 pcs., Epoxy resin primer flanges, sanded = approx. 20 pcs., Zurich gutter overflow channel lining (without tile material) = approx. 21 m², shaped stone overflow channel Zurich gutter (without tile material) = approx. 21m, wall covering tile pool (without tile material) = approx. 27 m², floor covering pool tile (without tile material) = approx. 11 m².