Implementation of renovation and replacing the ventilation system and the wastewater collection station in Wing B | Tenderlake

Implementation of renovation and replacing the ventilation system and the wastewater collection station in Wing B

Contract Value:
-
Notice Type:
Contract award notice
Published Date:
08 August 2018
Closing Date:
Location(s):
DE12 Karlsruhe (DE Germany/DEUTSCHLAND)
Description:

The contract involves planning, manufacturing, delivering and assembling a new wastewater collection station (Chemie III) in Room B001 and a new ventilation system for the Rooms B001 and B002 in Wing B (JRC Karlsruhe).

It does not involve dismantling the current wastewater collection station and its components. Once these new facilities have been installed, the current floor inlets must be sealed. The control panel for the wastewater collection station shall be installed in room B035. The ventilation system shall be controlled by the existing ventilation control panel in room B023.



Implementation of renovation and replacing the ventilation system and the wastewater collection station in Wing B

Awarded to:
Implementation of renovation and replacing the ventilation system and the wastewater collection station in Wing B
Kraftanlagen Heidelberg GmbH, Heidelberg (DE)
Download full details as .pdf
The Buyer:
European Commission, Joint Research Centre (JRC), Karlsruhe
CPV Code(s):
42122220 - Sewage pumps
42520000 - Ventilation equipment
42996000 - Machinery for the treatment of sewage