Humboldt-Gymnasium Vaterstetten - Extension II - LV 502-2 outdoor facilities
Demolition of concrete block coverings: in total approx. 200 sqm
Loosen and dispose of soil: approx. 200 cbm
Production of asphalt surfaces: approx. 530 sqm
Production of lawn paved areas: approx. 580 square meters
Construction of paths and square areas with concrete slabs: approx. 2,800 square meters
of which built area: approx. 150 sqm
Installation of drainage channels NW 100: approx. 130 m
Concrete board installation edging: approx. 600 m
Installation edging steel edge: approx. 227 m
Built-in ball fence, H=400 cm: approx. 25 m
Built-in double rod mat fence, height 150 cm: approx. 100 m.
Installation of swing gates up to LW 2m: 3 pcs.
Installation of bicycle high-low parkers: 263 parking spaces
Installation of precast concrete elements as seating elements with wooden supports: approx. 100 m
Making bezels from L-stones: approx. 40 m
Installation trash and tool shed incl. ext. Roof greening: floor area approx. 40 sqm
Installation of automatic 2-swing gate: LW approx. 5 m
Digging tree pits and backfilling: 43 pcs.
Production of lawns including earthworks: approx. 2,200 square meters
Deliver topsoil for lawns: approx. 400 cbm
Supply topsoil for vegetation areas: approx. 600 cbm
Tree pit substrate (A and B) deliver: approx. 500 cbm
Planting of large trees in green areas: 43 pcs.
Production of vegetation areas including perennials/woody plants: approx. 1,500 square meters
Lawn seeding: approx. 2,800 sqm
Herb seeding lawn joint paving pitch area: 580 sqm
Restore lawn: approx. 550 square meters
all planting work including completion care (1 year) and development care (2 years)