Christoph-Graupner-Schule - Renovation of the existing building and extension, technical planning Technical equipment acc. Part 4 Section 2 HOAI AG 4-5 and 8.
The order includes the technical planning technical equipment acc. Part 4 Section 2 HOAI AG 4-5 and 8 for the Christoph Graupner School - Renovation of the existing building and expansion of the new building.
A partial and gradual commissioning of LPH 1-9 is planned.
Task:
The Christoph Graupner School in Darmstadt is a school specializing in mental development with a department for physical and motor development. The mission of the school is to provide cultural and social participation to children and young people with intellectual disabilities. The school is currently suffering from a significant shortage of space, as today's number of students significantly exceeds the original capacity. There is also a great need for refurbishment. Against this background, proposals for a restructuring of the stock combined with a new component were sought in the previously held architectural competition.
The program area (NF without sanitary areas) is 3 975 square meters.
For this demanding task, a well-planned and efficient planning office is sought in terms of both planning and construction.
The construction costs for the cost groups (each net) are estimated by the promoter according to current knowledge as follows:
KG 440 + 540 power installations 838 235 EUR
KG 450 Telecommunications and Information Technology. App. 335 294 EUR
KG 480 building automation 60 000 EUR. App.
KG 480 building automation 60 000 EUR
Implementation period
The construction of the HU-Bau will take place immediately after commissioning in the third quarter of 2019.
Further information s. VI.3