Heating work for the new construction of the Lenggries nursing home consisting of a raw installation, partly Thermal insulation of the pipes, connection to on-site district heating transfer station, construction and installation of hot water preparation, construction of heating distributors with accessories, laying of underfloor heating and installation of bathroom radiators.
Drinking water heater in the storage charging principle – 1 pc
Precision pressure maintenance with compressor – 1 pc
Steel pipe up to DN80 – approx. 300 m
Copper pipe up to DN50 – approx. 2500 m
Thermal insulation mineral wool of risers – approx. 300 m
Compact insulating sleeve in FB construction – approx. 1900 m
Bathroom radiators – approx. 81 pcs
Klettpanel-Rohrträgerelement – ca. 4500 m²
Klettrohr – ca. 19400 m
FBH distributor with flush-mounted cabinet – approx. 36 pcs