B49, replacement bridge train Wetzlar, "New construction of Dalheim bypass - Eulingeberg tunnel". Phases 1 and 2 Object planning of civil engineering structures, specialist planning of structural engineering, technical equipment.
Service to be performed:
- Scope of services for project planning of tunnel engineering structures for the object(s):
- Preliminary cut south and north incl. necessary engineering structures
- Tunnel Eulingsberg incl. ancillary facilities (BG/ RHE/ LB)
[BG=Company building/ RHE=Restraint device/ LB=Extinguishing water basin]
- Scope of services for the structural design of the tunnel for the object(s):
- Pre-cut south and north including necessary engineering structures and tunnel aprons
- Tunnel Eulingsberg incl. ancillary facilities (BG/ RHE/ LB)
- Scope of services for technical planning of technical equipment tunnel for the object(s):
- Tunnel Eulingsberg incl. ancillary facilities (BG/ RHE/ LB)
For all service profiles, phases 1 and 2 according to HOAI.
- Other/other services according to point B of the service description
- Examination and presentation of the pre-incisions
- Setzungsabschätzungen
- Lüftungsgutachten
- Supply and disposal of tunnel construction and pre-cuts/fields
- Investigation of the operation of a tube in oncoming traffic (traffic routing during construction)
- Presentation of the variant investigation (technical equipment)
- Kollisionsprüfung Voreinschnitt
- Elaboration of a preliminary construction site concept
- Construction schedule
- Determination of the excavation masses, pre-cut and tunnel construction
- Presentation of the variant investigation at the BMDV
- Construction of traffic routing / tunnel in two-way traffic
- Special service traffic engineering
Execution periods:
Start of execution: No later than 3 working days after the contract has been awarded.
Latest award of the contract: 06 week 2024.
Completion of all LPH services: 1 to 12 weeks after award of the contract
Completion of all LPH services: 2 to 52 weeks after award of the contract
Completion of the special services under B5.2.: same as LPH 2
Completion of total output up to 150 weeks after award of the contract