The subject of the procedure is the construction of a research and laboratory building for the Hans Knöll Institute (HKI) on the Beutenberg campus in Jena.
Lot 1037-055 VE 420 Central water treatment
Gross amounts:
Ultrapure water system as a central unit, completely piped and on a frame with complete cladding for approx. 2,000 l / d, consisting of the following components
- automatic backwash filter;
- system separator;
- double water softener;
- RO system with downstream EDI 250 l / h;
- membrane degassing;
- storage tank 1 000 l;
- double pump booster system;
- UV disinfection;
- sterile filter combination;
- heat exchanger in loop return;
- fully automatic control in the control cabinet.
The subject of the procedure is the construction of a 5-storey new research building with laboratory space for the Leibnitz Institute for Natural Product Research and Infection Biology, the Hans Knöll Institute (HKI) on the Beutenberg Campus in Jena.
The HKI was founded in 1991 and is now a state-of-the-art research institute with 420 employees. These are dedicated to the research topics of infection biology and new natural substances from microorganisms that can be used to fight infections. Due to the further scientific profiling and the associated personal development of the HKI, the existing building capacities are no longer sufficient. The former laboratory houses 1 and 2 were therefore demolished and the new HKI building with a gross floor area of 5 761 m was built on the resulting free space
Here lot: 1037-055 VE 420 Central water treatment.