The triple sports hall will be renovated and modernized. The roof of prestressed concrete trusses will be demolished and replaced by a new wooden structure. The north side of the hall will receive a new post-and-beam facade. The other existing flat roofs are being renovated. On the eastern side of the gable, an extension with two storeys in reinforced concrete construction will be added. The interior is largely renewed. The outdoor facilities in the west will receive a new ramp and staircase.
The following services are essentially to be awarded with this certification: building carpentry work, metal construction work, installation of doors and windows as well as accessories, glazing work, hardware work
72 m
79 m
205 m
205 m
180 m
105 m ball rolling board, 430 mm
114 m
220 m
334 m
5 St. Equipment locker door, 4 350 x 2 400 mm
2 St. Equipment locker door, 3 000 x 2 400 mm
1 external door suitable for impact wall covering 2 940 x 2 480, double leaf
6 St. sports hall access door, T30-2-RS, 1-flgl., 1 150 x 2260
6 pc allowance glass cutout, 300 x 1 200 mm
17 pcs. Door handle set stainless steel
4 St. sports equipment door
5 pieces of clothing equipment doors with flächenel. Baffle wall UK, 4 000 x 2 300 mm