ETICS and exterior plastering work for the construction of a new combined bathroom system
WDVS-SYSTEM:
Substrate preparation
Approx. 450 m² protective cover / windows, doors, facades etc.
Approx. 730 m² Cleaning and checking the substrate - KS masonry / reinforced concrete
Approx. 175 m² of levelling plaster
Approx. 730 m² priming
Approx. 155 m² levelling with insulation boards 2 cm
Sockelsystem:
Approx. 255 m² pruning perimeter insulation
Approx. 168 m² plinth/perimeter insulation 035, panel thickness: 140mm
Approx. 158 m² plinth reinforcement and top plaster layer
Approx. 280 m² dimpled membrane with drainage fleece in the base area
Approx. 158 m² priming wall surfaces
Approx. 158 m² silicone resin paint base
WDVS/ EPS:
Approx. 575 m² EPS insulation boards 160 mm WLG 035
Approx. 575 m² reinforcing layer mineral – medium-layer
Approx. 240 m² allowance Additional reinforcement of impact-prone area
approx. 575 m² Zwischenbeschichtung
Approx. 575 m² mineral finishing plaster
Approx. 575 m² primer on mineral wall surfaces
Approx. 575 m² silicone resin paint façade, double
Approx. 5 pcs allowance apply colored symbolism, float
approx. 310 m² Graffitischutz
Edges, connectors:
approx. 150 m Sockelabschlussprofil
Laying approx. 80 m of edge protection
Forming an expansion joint of approx. 60 m
Approx. 335 m connection sealing with joint sealant
Approx. 127 m connection with plaster strip, windows, doors
Approx. 87 m ETICS connection to reveal plates
Approx. 455 m connection sealing with PU joint sealant
Blanket:
Approx. 250 m² MW insulation glue, 100 mm (ceilings)
Approx. 250 m² anchoring Miwo lamellar insulation boards ceiling
approx. 95 m Tropfkantenprofil
Approx. 250 m² reinforcing layer mineral – medium-layer
approx. 250 m² Zwischenbeschichtung
Approx. 250 m² mineral finishing plaster
Approx. 250 m² primer on mineral wall surfaces
Approx. 250 m² silicone resin paint façade, double
Others:
Approx. 100 pcs assembly cylinder made of EPS rigid foam
Approx. 83 pcs Mounting plate PU 200/ 200 mm, pressure-resistant
Approx. 205 m cavities Fill slots 10/2-20/4 cm
EXTERIOR PLASTERING SYSTEM:
wall:
Approx. 465 m² Cleaning and checking the substrate - KS masonry / reinforced concrete
Approx. 465 m² substrate preparation, primer
approx. 465 m² Untergrundvorbereitung, Haftbrücke
approx. 30 m² Sockelputz
Approx. 465 m² flush-mounted façade with lightweight plaster PII
Approx. 465 m² Full-surface fabric filler
Approx. 465 m² mineral finishing plaster
Blanket:
approx. 390 m² Untergrundvorbereitung, Haftbrücke
approx. 55 m² Tropfkantenprofil
Approx. 335 m² flush-mounted façade with lightweight plaster PII
Approx. 335 m² Full-surface fabric filler
Approx. 335 m² mineral finishing plaster
Others
All civil engineering and shell construction services are provided on site, and cross-trade coordination is carried out with the local construction management. An automatic coordination of interfaces to third-party trades (main construction services, ventilation, bathing water and electrical engineering) is mandatory.