Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 April 2019
Closing Date:
20 May 2019
Location(s):
FI1D7 Lappi (FI Finland/SUOMI / FINLAND)
Description:
Life cycle project of Ivalo School Center

The acquisition is a life-cycle project of the Inari municipality, which will be the new school center in Ivalo. In addition, the purchase includes separately defined maintenance and user services. The aim is that the project developer is responsible for the usability and conditions of the building for a service period of about 20 years. The contract structure and scope of the contract as a whole will be clarified during the procurement negotiation phase. The aim is to sign the contract in early spring 2020 and start construction as soon as possible thereafter. The current target for the school center's launch date is the beginning of the fall semester 2022. In procurement, the price-to-quality ratio is 40-60% and quality-40-60%.



The acquisition is a life-cycle project of the Inari municipality, which will be the new school center in Ivalo. In addition, the purchase includes separately defined maintenance and user services. The school center will be built for about 500 to 550 students, including facilities for pre-school, single-school (grades 1-9) and high school. In addition, a sports hall, an auditorium, a manufacturing kitchen and other facilities needed for educational purposes will be built in the school center. In addition to teaching and administrative use, the school facilities (especially the sports hall) are used for evening and weekend use, which is taken into account in the design. The total size of the school center is currently estimated at about 7,500 km 2 . The acquisition also covers the maintenance and user services of the target building during the agreed service period. The aim is that the project developer is responsible for the usability and conditions of the building for a service period of about 20 years. The contract structure and scope of the contract as a whole will be clarified during the procurement negotiation phase. The geographic location of the object is taken into account when defining maintenance and user services. The school center will be built on the site of the present Ivalo elementary school. Demolition of the buildings currently located on the site will also be included in the contract work for the project. The aim is to sign the contract in early spring 2020 and start construction as soon as possible thereafter. The current target for the school center's launch date is the beginning of the fall semester 2022. In procurement, the price-to-quality ratio is 40-60% and quality-40-60%. The benchmarks to be considered in terms of quality are the functionality of the design solution, the architectural solutions of the design solution and its suitability to the environment, the life-cycle perspective of the design solution and the project implementation methods. Project language is Finnish. An application for participation can be made and a consortium, or a consortium, can be selected to implement the project. Members of the grouping cannot be reduced or changed. Members of the grouping may be added provided that the new members meet the requirements set out in this contract notice and provide the required documentation. These requirements must already be met by the grouping in which the application for membership is made. Further information on the intended content of the procurement is available in the attachments to the procurement notice.

Download full details as .pdf
The Buyer:
Inarin kunta
CPV Code(s):
31000000 - Electrical machinery, apparatus, equipment and consumables; lighting
44000000 - Construction structures and materials; auxiliary products to construction (except electric apparatus)
45000000 - Construction work
50000000 - Repair and maintenance services
70000000 - Real estate services
71000000 - Architectural, construction, engineering and inspection services