Demolition and dismantling work of the old indoor pool building with extensions, partial demolition of walls of the basement floor, perforation of the concrete floor slab, demolition of technical systems (HLS systems, electrical systems, bath technology systems) in the KG, filling of excavation pit
Demolition of the old indoor pool building with extensions
- 1010 m2 demolition P-R steel/glass and aluminum/glass facades
- 3050 m2 demolition flat roofs with insulation and wooden formwork
- 750 m dismantling laminated binder h/w up to 120/20 cm
- 530 m dismantling trusses, timber
- 970 m3 demolition of reinforced concrete walls, inside and outside, d= from 35 to 65 cm
- 2026 m3 demolition of reinforced concrete floors and pool floors
- 7600 m3 backfilling excavation pits
- 1 pcs Demolition of HLS and bath water systems
- 1 pcs Demolition of low-voltage and high-voltage electrical systems