Lot 6 Roofers/plumbers
279 m Dismantling of ALU roof edge end profiles ; 1773 m² of bitumen-based roof waterproofing removal, multi-layer ; 730 m² allowance for demolition further bitum. roofing sheet; Remove 278 m of tow strip from ALU; 46.5 t disposal fee bitumen roofing membrane not containing tar and asbestos; 1641 m² of cold bitumen primer on swept roof surfaces; 1555 m² roof waterproofing, polymer bitumen membrane PYE-KTP-KSP 4.0 mm, lower layer; 50 m2 roof waterproofing, polymer bitumen lower layer in the gutter element (trough); 287 m roof edge board, OSB, 200 x 30 mm mount; 1558 m² roof waterproofing, polymer bitumen membrane PYE-KTP-S5, 5.0 mm, top layer; 168 m2 waterproofing drainage channel, liquid plastic, PMMA; 290 m roof waterproofing connection upper layer, roof edge, cut <55 cm ; 7 pcs skylight, acrylic / PVC, barrel shape, 90/120 cm; 24 pcs flat roof vent, PVC, DN 100; Renew 7 inspection openings; 339 m roof edge profile, 2-part, ALU natural, glare height: 200 mm; 24 pcs Sekurant fall protection with sealing set; 64 pcs balcony drainage unit, decorated Steel, with downpipe, above EG-3. OG; 16 pcs balcony drainage unit, verz. steel, free-end;