Construction of 50 collective dwellings, 54 parking spaces and associative premises.
Earthworks / foundations / structural work.
Flexible floor coverings.
Painting.
Heating / VMC.
Plumbing / sanitation.
Electricity CFO CFA.
Lifts.
Garage door.
VRD.
Green spaces.
Seal.
Wood frame / roof.
Facade cladding.
Metalwork / locksmith.
Exterior joinery and occultations.
Partitions / dubbing / false ceilings.
Interior joinery.
Floor tiles tiles.