Subsidized housing construction for state employees of the Free State of Bavaria:
Demolition of an existing building with garages and construction of a total of 63 apartments with underground parking in Traunsteinerstraße 55-61, Munich by Stadibau GmbH.
The open spaces are approximately 3,200 m².
The main services are:
concrete paving pavement paths 320 m² concrete paving surface fire brigade access 230 m² lawn honeycomb fire service access 390 m² site access asphalt 40 m² concrete slab covering space area 180 m² concrete slab covering terraces garden houses 120 m² concrete slabs entrance areas garden sheds 25 m² lawn joint paving bicycle spaces 80 m² pine treads 115 m² edging concrete strip blocks 385 m edging steel edges 630 m trenches electrical lines 150 m some concrete block steps some concrete angle blocks foundations mast and bollard lights foundations privacy elements various drainage devices with pipe connections gravel rigols bicycle racks 58 pcs benches 4 pcs play equipment 6 pcs fall protection pads Riesl and Sand 105 m² lawns/meadows 1,180 m² planting areas 415 m² tree planting 15 pcs shrub and perennial plantings (all quantities are approximate)