4430 Ventilation systems
Renovation of the supply air ventilation unit (80,000 m³/h,
chamber design) with humidification, filters,
soundproofing baffles, including replacement of the central
Supply air fan by 4 fans
Improvement of the hygiene of the supply air system, laboratories and
Air conditioning measuring rooms
Installation of 359 m² of ventilation pipes/ducts + 125 m
Winding seam tube made of verzill. Steel incl. thermal insulation +
Sheathing, 98 m² + 165 m pipe + 110 fittings made of
Plastic PPS incl. built-in parts
Installation of 4 oil and emulsion mist separators incl. 4
Extraction arms + 25 m pipe
Ventilation of the new emergency lighting room
Replacement of 2 exhaust fans and conversion of the supply and exhaust air
in the chemical warehouse
Air-side connection to safety cabinets incl. control system
for transfer chamber
Construction and connection of temporary devices (rental equipment)
on-site)
Fire protection renovation of building services installations (4 new BSK, 30 m²
BS cladding, 10 BS bulkheads, 22 mortar bulkheads)
Demolition and disposal of MEP installations (5
fans, 12 heat exchangers, 154 m of piping,
Sound insulation backdrops, e.g. insulation materials according to TRGS 521)
In addition, the award of 'maintenance services' is the subject of the procedure.