The city of Vilsbiburg is in the process of opening the Vilstalhalle (multi-purpose hall with 3 compartments, stage and grandstand)
to renovate and expand.
The construction period is scheduled from July 2023 to December 2025.
The work covers all trades of building construction.
For the Vilstalhalle Vilsbiburg, all pipelines of the drinking water supply,
Dirty water disposal, heat distribution and all ventilation ducts and pipes renewed. The insulation
In the case of stainless steel pipes for drinking water and heating, mineral wool shells are to be used, for which
Dirty water pipes made of PP and SML as closed-cell rubber, as well as the ventilation pipes.
This only serves to prevent condensation from forming. The dirty water pipes are partially
nor provided with a protective hose for sound insulation. A duct routing of ventilation ducts in the
Outdoor area is not provided.
approx. 80 m insulation rubber PP/SML
approx. 80 pcs fire protection shells
approx. 20 pcs fire protection sleeve
ca. 3.100 m Dämmschalen Edelstahlleitungen
approx. 500 m² insulation rubber ventilation ducts