Augustinermuseum, Augustinerplatz 1-3, 79098 Freiburg, renovation 3rd construction phase,
Heating and cooling installation:
- 19 pumps,
- approx. 2 900 m steel pipe, approx. 2 000 m copper installation pipe,
- approx. 25 tubular radiators, 11 convection convectors, 1 door air curtain,
- approx. 400 m * underfloor heating.
Heating and cooling installation, Augustinermuseum 3rd BA. For a detailed description see II.1.4)