- approx. 2 700 m
- approx. 920 m
- approx. 560 m
- supply and install approx. 5 250 m3 of building material (coarse-grained soil);
- Cut off approx. 980 m of drainage pipeline up to DN 250;
- Cut off approx. 700 m drainage pipeline via DN 250 to DN 500;
- approx. 6 700 m
- approx. 7 200 m
- Pick up about 620 m of concrete curbs;
- approx. 2 060 m
- Put approx. 620 m of flat curbs FB 200x200;
- approx. 8 600 m
- approx. 8 600 m
- approx. 8 230 m
- Build approx. 700 m of drain pipe DN 100;
- Establish approx. 220 m connection line DN 150;
- produce approx. 700 m concrete pipeline DN 300 B;
- approx. 4 200 m
- Remove approx. 3 large signposts;
- Attach approx. 3 large signposts.
- approx. 2 700 m
- approx. 920 m
- approx. 560 m
- approx. 5 250 m
- Cut off approx. 980 m of drainage pipeline up to DN 250;
- Cut off approx. 700 m drainage pipeline via DN 250 to DN 500;
- approx. 6 700 m
- approx. 7 200 m
- Pick up about 620 m of concrete curbs;
- approx. 2 060 m
- Put approx. 620 m of flat curbs FB 200x200;
- approx. 8 600 m
- approx. 8 600 m
- approx. 8 230 m
- Build approx. 700 m of drain pipe DN 100;
- Establish approx. 220 m connection line DN 150;
- produce approx. 700 m concrete pipeline DN 300 B;
- approx. 4 200 m
- Remove approx. 3 large signposts;
- Attach approx. 3 large signposts.