Architectural, construction, engineering and inspection services | Tenderlake

Architectural, construction, engineering and inspection services

Contract Value:
EUR 640K - 640K
Notice Type:
Contract Notice
Published Date:
28 October 2022
Closing Date:
25 November 2022
Location(s):
BE336 Bezirk Verviers - Deutschsprachige Gemeinschaft (BE Belgium/BELGIQUE-BELGIË)
Description:
CONTRACT AS PROJECT AUTHOR FOR THE CONSTRUCTION OF A JOINT LOCATION CAJ INTEGO AND RZKB INCLUDING A TRAINING CENTER AND A COMPANY CRÈCHE

Intego is a training and integration project for jobseekers who face numerous obstacles to social and professional integration.

The construction project will provide an ideal framework for providing these people with intensive support and promoting their personal development, but also providing them with professional, interdisciplinary and social skills.

At the same time, a company crèche run by RZKB with a capacity of 24 places will be accommodated on the site.

These specifications relate to a comprehensive contract for the study and supervision of the construction of a training centre and an in-company crèche.

including the establishment of the environment, access roads and specific equipment.

location

The approximately 6250 m2 plot is located in the EAST BELGIUM PARK in 4700 Eupen, textile street.

The object has the following cadastral designation: GEMARKUNG EUPEN GEM 1 FLUR B 33T4, 33N4, 33P4, 33R4 and 33S4.

The measurement of the parcel is attached to these specifications.

There is a wetland on the site, which must be preserved in its current state. Incidentally, the contracting authority wishes to use this area with a water point within the framework of the gardening and landscaping workshops.

AUFTRAGSTRANCHEN

It is an order divided into 2 sections:

- Section 1 (fixed section) - in connection with the complete task of the project author (study) with a view to appointing a company to carry out the work. This tranche shall begin with the announcement of the service contract and shall end before the announcement of the works contract.

- Tranche 2 (conditional tranche) comprehensive project management in supervising the construction works up to final acceptance; this tranche shall commence with the announcement of the works contract.

A uniform fee share of 10% is used for the entire order. It shall be imposed by the contracting authority.

By submitting its tender, the tenderer undertakes for its entire tender and all instalments, while the contracting authority undertakes only for the fixed tranche.

If the contracting authority does not use the conditional instalment, the tenderer shall not be entitled to compensation.

A full description of the tasks covered by this contract can be found in the special specifications Chapter III. Description of the technical requirements.

Intego is a training and integration project for jobseekers working with

are faced with numerous obstacles to social and occupational integration.

The construction project will provide an ideal framework for intensive training of these people.

and to promote their personal development, but also to provide them with professional,

to impart interdisciplinary and social skills.

At the same time, a company crèche run by the RZKB with

a capacity of 24 seats.

COMPETENCIES

The project author must submit an offer that includes all the following

Professional qualifications cover:

-Architecture;

- Statiktechnik;

- Building technology (heating, air conditioning, ventilation, electricity, lighting, fire protection)

and burglar protection, various supply line connections, contacts with

network operators, etc.);

- EEG regulations (EEG manager and author of a technical

feasibility study in the context of the new commitments concerning the EEG);

- Safety and Health Coordinator Planning and execution.

The project author also takes over the coordination of the various above-mentioned

Interested parties and the necessary external parties necessary for the fulfilment of the

task entrusted to it.

The team can draw on all the competencies it needs for proper

The study and the work must be carried out. The problems associated with these possible

Fees associated with additional competencies must be included in the fees

which are imposed for the present contract. Therefore, no additional fee is granted for any other competence, unless it is subsequently

is expressly required by the contracting authority.

The full description of the tasks entrusted to the multidisciplinary team

can be found in Part III. Description of the technical requirements.

The special specifications are regarded as a contract for the task of the project author.

Download full details as .pdf
The Buyer:
SPI(3p)
CPV Code(s):
71000000 - Architectural, construction, engineering and inspection services