The subject of the order is the development of project documentation for the task: "Construction of runway navigation lighting masts with accompanying infrastructure at the Radom-Sadków airport".
The subject of the contract is the development of the conceptual design, construction design together with PFU and technical specification of the execution and acceptance of construction works for the task "Construction of runway navigation lighting masts with accompanying infrastructure at the Radom-Sadków airport" together with the author's supervision.
As part of the task, the contractor will obtain the legally required arrangements, permits and decisions, completed construction design and supplementary projects, obtain a decision authorizing the implementation of public purpose investments based on the Act of 12.2.2009 on special rules for the preparation and implementation of investments in public use airports and draw up a functional and utility program.
The documentation is to be prepared in cooperation with the contracting authority and in compliance with applicable regulations, based on the initial concept of airport expansion along with guidelines from the Terms of Reference.
The scope of the task includes:
1. Designing masts with foundations for navigation lighting approach 25 at a distance of 900 m from the threshold (light landing approach system in the ALPA ATA category I system with a flash axis and identification lights of the RTIL runway threshold).
2. Designing masts with foundations for navigational lighting approach 07 on the section 420 m from the threshold (simple arrangement of approach lights).
3. Designing primary and secondary cable sewage system along masts of the approach system on directions 25 and 07 together with a link to cable ducts designed as part of other investment tasks implemented by the contracting authority. Sewerage with drainage.
4. Design of teletechnical cable sewage system for the needs of the ZSB system together with a link to cable sewage system designed as part of other investment tasks implemented by the contracting authority with a length of about 600 m. Drainage system with drainage.
5. Designing the patrol road system on the eastern side of the airport according to the attached concept of airport expansion.
6. Designing a fence on the eastern side of the airport according to the attached concept of airport expansion along with an entrance gate with immediate security control.
7. Designing the access and fire roads system on the eastern side of the airport according to the attached concept of the airport expansion together with the rainwater drainage system.
8. Designing mast fencing in the field outside the airport.