For the construction of a temporary school location, the property is cleared for the construction of a temporary school location.
A construction clearance is planned. For this purpose, soil replacement and deep dededemeration must be carried out by the AN. The excavation pit must also be manufactured for the installation of 2 sedimentation tanks and one rigole.
The drainage elements are installed during construction clearance (estimated duration: 10 working days). The construction clearance is expected to take place in the period October 2021 to June 2022.