The construction project is the general renovation of the primary and secondary school in
Höchstädt (Danube). This building is the part of the building from the 60s and its extension from the 90s.
Both parts of the building have a basement and extend
over a total of 4 floors. (KG, ground floor, 1st floor, 2nd floor)
Site equipment:
- construction site equipment
Window work:
- Construction drawings: 1 pschl
- Removal/disposal best. Aluminium windows: 60 m²
- Security measures: 60 m²
- Aluminium Fensterelement: 50 m²
- Fensterblech: 35 m
Outside doors:
- Exterior doors: 4m²