The Trier Region Waste Management Association A.R.T. is currently constructing a new operating and administration building on the site of the Waste Management and Recycling Centre (EVZ) Mertesdorf.
The new building is designed in such a way that, in addition to the administration area, there is also a workshop area, social/changing areas and storage facilities.
These areas will be divided into four floors (ground floor, first mezzanine, second mezzanine and upper floor) with a total GFA of 5,129 m².
The aim of A.R.T. is to create a progressively functional, high-quality and sustainable working environment. In addition, above-average demands are placed on sustainability and environmental protection.
The electrical power supply, local cooling and local heating will come from the new energy centre, which is not the subject of this tender.
The interface is the shut-off devices in the transfer shaft.
The supply line from the new energy centre will be supplied and installed by the external contractor.
The installation of the concrete core activation for the workshop, maintenance and wash hall area has also already been carried out.
Installation work for heating, ventilation and air conditioning systemsFive ventilation units with a total of approx. 15,200m³/h
18.500 m Fußbodenheizungsrohr
64 Kühlsegel at 600x1800mm
Plumbing workApprox. 850 m stainless steel system pipe as drinking water pipe
21 WC facilities
7 Reihenwaschtische
35 washbasins
21 showers