The city of Nürtingen intends to completely renovate the Hölderlin grammar school in Nürtingen. The main building was built in 1978 as a South Education Center and expanded in 1981 by a two-storey extension (component D).
In 2007, a canteen was added to the building complex. Over the years, minor renovation measures were carried out on the buildings and a photovoltaic system was built on parts of the roof area. As part of the canteen extension in 2007 (meeting place), an elevator was added to the atrium of the main building.
The construction project will be carried out in two construction phases.
As part of the overall renovation of the Hölderlin-Gymnasium Nürtingen, Gebäudewirtschaft Nürtingen intends to award landscaping work in the 2nd construction phase. The landscaping work required in construction phase 2 is part of the tender. They include the necessary measures for the restoration and adaptation of the outdoor facilities after the general renovation in the area of Building D (Part 1), the restoration of the sports facility used for the interim containers (Part 2), as well as the embankment planting of the urban vegetation area north of Building Part D (Part 3).
The work comprises the following overall services:
Construction site equipment and traffic safety
Clearing work 2,00 pcs.
Clearing and pruning work 385.00 m²
Small-scale demolition work
Demolition of asphalt base and surface course 600.00 m²
Demolition of synthetic surface running track 641.00 m²
Demolition of unbound base courses 645.00 m²
Demolition of slab and paving surface 320.00 m²
Demolition edgings 90.00 m
Demolition of eaves strip 65.00 m²
Excavation work for ventilation trenches 25.00 m³
Soil application and slope modelling 100.00 m³
Eaves strip with concrete block slabs 35.00 m²
Gravel eaves and gravel verge 120.00 m²
Randeinfassungen TB 8/20 70,00 m
Long jump 5.00 m
Natural stone pavement, unbound 20.00 m²
Granite-Aufkantung 25,00 m
Concrete paving, unbound 20.00 m²
Top layer natural stone material 0/8 185,00 m²
Asphalttragdeckschicht 30,00 m²
Reconstructing/reworking asphalt base course 130.00 m²
Synthetic surface running track 641.00 m²
Marking work running track 1.00 pcs.
Equipment elements sports facility 4,00 pcs.
Retaining walls made of wall angles type 80 32.00 m
Excavation work for earthing and lightning protection 100.00 m
Small-scale drainage works
Rehabilitation of the underground pipelines in the outdoor facilities on a small scale
Vegetation areas (ground cover + woody plants) 555.00 m²
Lawns 650.00 m²
Sowing areas incl. completion maintenance 2750,00 m²
Aeration of existing trees and shrubs 146,00 pcs.
New planting of trees and shrubs 1.00 pcs.