Medium renovation of auxiliary equipment of the electrostatic precipitator boiler, ash drainage at CEZ Chorzów S.A. in 2023, 2024 and 2025.
Medium repair of auxiliary equipment of the electrostatic precipitator boiler, ash drainage at CEZ Chorzów S.A. in the years 2023 Block 1 - from 22.04. to 23.05. Block2 – from 10.06. to 11.07Medium repair of auxiliary equipment of the electrostatic precipitator boiler, ash drainage in CEZ Chorzów S.A. in (Unit No. 1 and Unit No. 2)
in 2023 Block 1- from 22.04. to 23.05. Block 2 – from 10.06. to 11.07.
Medium repair of auxiliary equipment of the electrostatic precipitator boiler, ash drainage at CEZ Chorzów S.A. in the years 2024 Block 1 - from 20.04. to 21.05. Block 2 – from 08.06. to 09.07.Medium repair of auxiliary equipment of the electrostatic precipitator boiler, ash drainage in CEZ Chorzów S.A. (Unit No. 1 and Unit No. 2)
in the years 2024 Block 1- from 20.04. to 21.05. Block 2 – from 08.06. to 09.07.
Medium renovation of auxiliary equipment of the electrostatic precipitator boiler, ash drainage at CEZ Chorzów S.A. in the years 2025 Block 1 - from 26.04. to 27.05. Block 2 – from 07.06. to 08.07.Medium renovation of auxiliary equipment of the electrostatic precipitator boiler, ash drainage in CEZ Chorzów S.A. (Unit No. 1 and Unit No. 2) in 2025
Block 1- from 26.04. to 27.05. Block 2 – from 07.06. to 08.07.