Building 24, station 19
- Extension and modernization building,
- clinker work.
Factory and assembly planning for facades 1 psch
Barrier layer <50 cm 146 m
MW insulation material 140 mm, WLG 032, facing masonry 382 m
Clinker facing masonry Glatter Wilder Association 403 m
Work on clinker facade against window / door / frame vertically 112 m
Bracket anchor, point support, base, 0.70 to 7.50 m 112 m
Precast lintel / facade support, approx. 76 cm to 450 cm 63
Precast stone concrete, base, various lengths 124 m
Cleaning exposed brickwork from clinker 403 m