In order to create a pedestrian and cycle path overpass, in the course of the Jägersteg, the construction of a new pedestrian and cycle bridge over the B51 OU-Münster is to be carried out. The bridge structure is to be designed as a steel truss construction. Earthworks and road works for the construction of the ramps are to be carried out.
Clearing an area of approx. 3,110 m²
approx. 1980 m² Plane production for explosive ordnance - area sounding
ca. 240 m explosive ordnance borehole probing
approx. 7,929 m² topsoil work, partly with fascines
approx. 4,530 m³ earthworks
approx. 310 m³ Frostschutzschicht 0/45
approx. 675 m² asphalt base course made of AC 22 T N
ca. 675 m² Asphaltdeckschicht aus AC 5 D N
approx. 100 m set curbs
approx. 56 m² pavement / concrete
approx. 22 m make staircases from concrete block steps
approx. 300 m of steel-wood railing
1 psch Preparation of execution documents
approx. 740 m³ Baugrubenaushub
Deliver and install approx. 225 m³ of building material (soil replacement)
Supplying and installing approx. 410 m³ of building material (excavation pit filling)
1 psch water retention construction pits
approx. 234 m² sheet piling
2 bays
approx. 30 m Betonrohrleitung
1 psch Performing and evaluating vibration measurements
1 psch built-in vibration absorber
approx. 110 m² Sauberkeitsschicht
approx. 350 m³ reinforced concrete, cornice and chamber walls
ca. 20 St Geländerverankerung
approx. 110 m² artificial stone facing
approx. 17 m² sound-absorbing wall covering
approx. 37 t steel structure superstructure including corrosion protection
approx. 4.5 t steel construction on the wing walls including corrosion protection
approx. 98 m railing construction including corrosion protection
4 St Elastomerlager
2 St Horizontalkraftlager
approx. 9 m waterproof road crossing construction
approx. 126 m² asphalt surface course made of mastic asphalt
ca. 16 St Messbolzen