The services advertised include
- the reconstruction and replacement of the Wipperbrücke bridge in the course of the B 256 between Wipperfürth-Ohl and Marienheide, including the line renewal to approx. 290 m and reintegration of the junction area to the “Am Steinbruch” road.
- the construction and dismantling of a construction bypass (provisional) over a length of approx. 150 m, including a one-lane temporary bridge
- the piping of the submerged waters “Wipper” and “Obergraben”
The work advertised in part A contains the following main services:
approx. 2,500,000 m3 earthwork during road surface excavation
approx. 2,500,000 m2 of pavement, roadway
approx. 500,000 m2 of pavement, walkway
approx. 250,000 m2 of pavement demolition, provisional
Remove approx. 450,000 m3 of topsoil
approx. 410,000 pcs. grubbing rootstocks, various diameters
Lay approx. 15,000 m of DN 150 pipelines, including making a channel trench
Lay approx. 50,000 m of DN 200 pipelines, including making a channel trench
Routing approx. 120,000 m of DN 300 pipelines, including making a channel trench
Lay approx. 70,000 m seepage pipe DN 100, including making a channel trench
Produce approx. 70,000 m of trough
approx. 1 pc Produce prefabricated part shaft
approx. 1 pc Produce and cancel the prefabricated part shaft with lamella clarifier
produce approx. 74,500 m of piping luffing, steel profile with foundation blocks, and
terminating
Establish and discontinue approx. 60,000 m of Obergraben DN1600 SB pipework
installing and removing approx. 210,000 m3 gravel/sand cover piping
Dismantle approx. 300,000 m SE made of steel
Install approx. 500,000 m SE made of steel
approx. 1,075,000 m remove marking
Make approx. 1,300,000 m marking
approx. 750,000 m2 asphalt base layer made of AC 22 T N, provisional
approx. 750,000 m2 asphalt surface layer made of AC 11 D N, provisional
approx. 750,000 m2 blunting measures, provisional
approx. 400,000 m3 frost protection layer 0/45
approx. 2,750,000 m2 asphalt base layer made of AC 22 T S, roadway
approx. 2,750,000 m2 asphalt binder layer made of AC 16 B S, roadway
approx. 2,750,000 m2 asphalt surface layer made of SMA 8 S, roadway
approx. 35,000 m2 of minted asphalt in print process, roadway
approx. 2,750,000 m2 deadening measures, roadway
approx. 2,750,000 m3 frost protection layer 0/45
approx. 750,000 m2 of asphalt base layer made of AC 22 T L, walkway
approx. 750,000 m2 asphalt surface layer made of AC 5 D L, walkway
approx. 25,000 m² mastic asphalt trough made of MA 8 N
approx. 400,000 m² asphalt surface layer made of AC 11 D S, bridge, roadway
approx. 50,000 m2 asphalt surface layer made of MA 11 S, Brück, gutter/edge strip
Deliver and cover approx. 450,000 m3 of topsoil
Sow approx. 2,150,000 m2 of topsoil