This Engineering & Build assignment mainly includes the construction of a new
bridge over the Common Meuse. The installation of the new bridge
is located south of the existing bridge, so that during construction
of the new bridge mobility remains guaranteed via the existing bridge. At
the Flemish side connects the new bridge at the Labaerdijk to the
existing ovonde, located in the N78. This ovonde should be used for that purpose
adapted. On the Dutch side, the bridge connects to the Schansberg, which
needs to be adjusted.
This Engineering & Build assignment mainly includes the construction of a new
bridge over the Common Meuse. The installation of the new bridge
is located south of the existing bridge, so that during construction
of the new bridge mobility remains guaranteed via the existing bridge. At
the Flemish side connects the new bridge at the Labaerdijk to the
existing ovonde, located in the N78. This ovonde should be used for that purpose
adapted. On the Dutch side, the bridge connects to the Schansberg, which
needs to be adjusted.