1. The subject of the contract is the implementation of the task entitled:
"Construction of a brackish surface water treatment plant in Świnoujście with infrastructure"
Note: the subject of these proceedings - will be technologically related to the water intake carried out as part of a separate task, entitled: "Construction of a brackish surface water intake together with accompanying infrastructure for water supply to the city of Świnoujście – implementation of the task in the design and build mode - part A" and must refer to the solutions implemented as part of the raw water intake under construction.
The subject of the contract includes the design and construction works of a brackish water treatment plant with accompanying infrastructure:
The subject of the contract is the development of technical documentation and construction of a brackish surface water treatment plant with accompanying infrastructure, according to the detailed requirements described in the PFU. Treatment based in the final process with reverse osmosis systems together with a system for mixing treated water in a reverse osmosis system with treated water in an existing deep water treatment plant. The final product - water that meets the requirements for water intended for human consumption. Required final capacity of the system - 200m³/h.