Bw-Zentralkrankenhaus Koblenz-Metternich, new building 1.BA operating and functional building, heat supply and cooling systems
Wärmeanlagen:
- 6 heat transfer stations with base frame
- 10 pieces plate heat exchangers 500kW-900KW
- 13 pieces of membrane expansion vessels 10 l - 800l
- 2 pieces safety drip pan 3,000 l
- 100 m data cable Kat7A shielded 2x(4x2xAWG23)
- 1 piece of glycol mixing/collection and regenerative system
- 2 pieces distributor/collector combination 60m³/h for heat distribution network
- approx. 6,070 m steel tube seamless black AD 21.3 mm to 168.3 mm, welded
- approx. 15,650 m tube steel niro AD 15 mm to 54 mm, welded
- 2 pieces door air curtain
- 26 pieces infrared ceiling heaters 450W
- approx. 410 pieces. Measuring devices
- 2 pieces dosing pump system
- 32 high-efficiency inline pumps for heat distribution network
- approx. 200 fittings
- approx. 320 regulatory fittings
- 470 pieces of radiators,
- 288 pieces of circulating air cooler,
- approx. 1,950 m² underfloor heating
- commissioning
Refrigeration systems:
- 4 pieces distributor/collector combination 80m³/h - 350m³/h for cold water distribution network
- approx. 6,770 m steel tube seamless black AD 21.3 mm to 329.9 mm, welded
- approx. 800 m tube steel niro AD 42.4 mm to 139.7 mm, welded
- approx. 17,400 m tube steel niro AD 18 mm to 54 mm, pressed
- approx. 530 pieces. Measuring devices
- 46 high-efficiency inline pumps for cold water distribution network
- approx. 4,530 fittings
- approx. 730 regulatory fittings
- commissioning