Closed construction pit with dewatering approx. 35,000 m
Excavation, triage and removal to intermediate storage, backfilling
Total project scope:
- sheet pile walls 8,000 m
- Water retention approx. 18 filter wells;
- Excavation approx. 35,000 m
- Material filling approx. 35,000 m
Closed construction pit with dewatering approx. 35,000 m
Excavation, triage and removal to intermediate storage, backfilling
Total project scope:
- sheet pile walls 8,000 m
- Water retention approx. 18 filter wells;
- Excavation approx. 35,000 m
- Material filling approx. 35,000 m