Renovation of Merkel'sches Schwimmbad Esslingen:
The GFA is approx. 3,000 m² and the BRI 12,000 m³.
The following measures are to be carried out as part of the upcoming renovation:
- Complete renovation of the sports pool and the indoor swimming pool
- Renewal of the technical equipment
- fire protection upgrading
- Barrier-free access
The work will be carried out from September 2023 to December 2024.
Heating equipment:
- Dismantling best. Installations
- Heating manifold (10 outlets DN 32 – DN 80) incl. superstructure
- 1 fresh water station (3 cascade)
- approx. 30 radiators
- approx. 70 m² Wärmebänke
- approx. 1000 m stainless steel pipe (DN 15 – DN 32)
- approx. 250 m stainless steel pipe (DN 40 – DN 80)