The subject of the order is the supply (sale) of electricity to the Headquarters and the outlets of the Nadodrzański Branch of the Border Guard. The subject of the order is divided into 13 (thirteen) parts of the order, a detailed description of each part of the subject of the order is included in Annex 2 to SWZ.
Headquarters of the Nadodrzański Border Guard BranchBranch Krosno Odrzańskie — planned amount of 540 000 kWh. Round-the-clock electricity. The contracting authority is qualified for tariff group C21, power factor tg ≤ 0,4, the sale of electricity will be connected with 0.4 kV rails built on the basis of connection conditions to a network with a contractual power of 200 kW. The power consumption point is located within the DSO: ENEA Operator Sp. z o.o.
Border Guard Facility in Wrocław - StrachowicePSG in Wrocław — the planned amount of 56 500 kWh. Round-the-clock electricity. The contracting authority is qualified for the V connection group and settled in tariff group C11, supply voltage 3- phase 0,4 kV, contractual power 11 kW, converter protection 32A. The power consumption point is located within the DSO: Tauron Distribution S.A.
Border Guard facility in LegnicaPSG in Legnica — the planned amount of 59 000 kWh. Round-the-clock electricity. The contracting authority is qualified for the V connection group and settled in tariff group C11, supply voltage 3- phase 0,4 kV, contractual power 40 kW, converter protection 63A. Power consumption points are located within the DSO: Tauron Distribution S.A.
Border Guard facility in KłodzkoPSG in Kłodzko — the planned amount of 185 500 kWh. Round-the-clock electricity. The contracting authority is qualified for the IV connection group and settled in tariff group C21, supply voltage 3- phase 0,4 kV, contractual power 65 kW, converter protection 125A. Power consumption points are located within the DSO: Tauron Distribution S.A.
Border Guard facility in Gorzów Wlkp.PSG in Gorzów Wlkp — a planned amount of 58 000 kWh. Round-the-clock electricity. The contracting authority is qualified for the IV connection group and cleared in tariff group C21, power factor tg ≤ 0,4, contractual power 50 kW. The power consumption point is located within the DSO: ENEA Operator Sp. z o.o.
Border Guard facility in TuplicePSG in Tuplicach — a planned amount of 59 000 kWh. Round-the-clock electricity. The contracting party is qualified for tariff group C11, supplying power in a 3-phase system, with a precounter protection of 32 A, with a contractual power of 17 kW. The measuring and billing system consists of a settlement meter with no. Fabr. 7575688. The power consumption point is located on the territory of the OSD: ENEA Operator Sp. z o.o.
Border Guard facility in KaliszPSG in Kalisz — the planned amount of 52,000 kWh. Round-the-clock electricity. The contracting authority is qualified for tariff group C11, power factor tgφ ≤ 0,4, contractual power 13 kW with 25 A pre-meter protection in a 3 phase system. The power consumption point is located within the DSO: ENERGA OPERATOR S.A.
Border Guard facility in Secular;PSG in Świecko - multi-purpose building — planned amount of 410 500 kWh. The contracting authority is qualified for tariff group B23, power factor tgφ ≤ 0,4, cable line with a voltage of 15,0 kV, with a contractual power of 150 kW. The power consumption point is located within the DSO: ENEA Operator Sp. z o.o.
Border Guard Factor in Zgorzelec - Building No. 1PSG in Zgorzelec — planned amount of 71,000 kWh. Round-the-clock electricity. The contracting authority is qualified for tariff group C11, power factor tgφ ≤ 0,4, contractual power 40 kW converter security 63A. The power consumption point is located within the DSO: Tauron Distribution S.A.
Border Guard Factor in Zgorzelec - Building No. 2PSG in Zgorzelec garage - planned amount of 8,000 kWh. Round-the-clock electricity. The contracting authority is qualified for tariff group C11, contractual power 16.1 kW converter security 25A. The power consumption point is located within the DSO: Tauron Distribution S.A.
Border Guard facility in Zielona Góra - BabimostPSG in Zielona Góra — a planned amount of 44 000 kWh. Round-the-clock electricity. The contracting authority is qualified for tariff group C11, contractual power 11 kW converter security 25A.The contractor will supply electricity from 3-phase connectors. The power consumption point is located within the DSO: ENEA Operator Sp. z o.o.
Border Guard facility in Jelenia GóraPSG in Jelenia Góra — the planned amount of 60 500 kWh. Round-the-clock electricity. The contracting authority is qualified for the IV connection group and settled in tariff group C21, supply voltage 3- phase 0.4 kV, contractual power is 50 kW. The power consumption point is located within the DSO: Tauron Distribution S.A.
Contact Point with its registered office in Kudów ZdrójPSG in Kudów Zdrój — a planned amount of 49 000 kWh. Round-the-clock electricity. The contracting authority is qualified for the IV connection group and settled in tariff group C11, supply voltage 3- phase 0.4 kV, contractual power is 40 kW. The power consumption point is located within the DSO: Tauron Distribution S.A.