The subject of this EU announcement is the glass partition walls trade for phase II of the construction project Conversion & Renovation of the existing Therapy and Wellbeing Center in D-08648 Bad Brambach. The other trades will be published in separate announcements.
1 glass partition wall as fixed glazing, W/H = approx. 4.195/2.55 m,
RW, P 44dB
1 glass partition wall as fixed glazing, W/H = approx. 5.55/1.33 m,
RW, P 44dB
2 glass partition wall with double-leaf door element and fixed glazing,
W/H = approx. 4.59/2.47 m, F30/T30-RS
Particularities:
Special measures for construction work in the medicinal spring protection area (medicinal water protection zone II) are required.
Vehicles, machines and devices are to run on biofuel. hydraulic drives are,
switch to bio-hydraulic oil where technically possible.