The order covers the extension of national road No. 25 on the section Człuchów - voivodeship border
The order shall, in particular, include:
- extension of national road No. 25 with a total length of approx. 10 km,
- construction of bypasses of Ględowo and Jęczniki Wielkie,
- increasing the load capacity of the road surface structure to 115 kN / axle,
- extension of intersections on the reconstructed section of road,
- reconstruction of other public roads to the extent necessary,
- construction of additional roadways to the extent necessary,
- construction of a pedestrian and bicycle path along the entire length of the extended section of national road No. 25,
- construction and reconstruction of engineering structures (culverts) on the designed section of the national road,
- reconstruction/construction of sidewalks in the area of intersections and built-up areas, construction of asylums and pedestrian crossings,
- reconstruction of the railway crossing through the active single-track railway line No. 203 Tczew – Kostrzyń in the town of Wierzchowo Dworzec (railway crossing with turnstiles, category "A" located at km 107.741 of railway line No. 203),
- reconstruction of existing and construction of new bus bays,
- implementation of traffic calming elements,
- construction of acoustic screens,
- construction of a technological channel along the road,
- reconstruction of exits and construction of ditches under the exits,
- cutting down greenery interfering with the extension of the road,
- development of greenery within the boundaries of the designed road lane,
- marking of roads covered by the project,
- other works necessary for the proper functioning of the extended section of national road No. 25.
Estimated value of the order above €20,000,000.