22E0249 (LBB NL Koblenz) Bw-Zentralkrankenhaus Ko Metternich, new building 1st BA OP and functional building, sanitary facilities
- approx. 1,200m galvanized steel pipe, DN 40-DN 200 HDE roof drainage
- approx. 600m cast iron pipe, DN 100-DN 300 free mirror roof drainage
- 50 stainless steel roof drains
- 3 pieces of rainwater lifting systems
- ca. 5.400m PE-Rohr schallgedämmt, DN 50 – DN 150 Schmutzwasserleitung
- ca. 3.300m PE-Rohr, DN 32 – DN 200 Schmutzwasserleitung
- approx. 340m stainless steel pipe, DN 50 – DN 150 waste water pipe
- approx. 112 floor drains stainless steel/cast iron/plastic
- 6 pieces of dirty water lifting systems
- approx. 2.600m stainless steel pipe, DN15 – DN 25 condensate line
- approx. 28,000m stainless steel pipe, DN12 – DN80 drinking/garden/soft/separating water
- 4 pieces of pressure booster systems
- 1 piece of net separation system
- 5 softening systems
- approx. 420 pieces of sanitary objects porcelain/solid surface/steel enamelled including hygiene equipment and installation elements
- approx. 410 fittings
- approx. 200 connections kitchen furniture, medical appliances including hygiene equipment
- approx. 100 m seamless steel pipe, welded, DN 80- DN 100 natural gas pipeline
- 5 drinking water heating systems in the flow principle 150 – 555 kW
- 1 piece buffer tank 4000l
- 41 care work combinations