The new sports hall will be built on the area of the previous sports ground at the school between the school building and Waldschmidtstraße
built.
The building is predominantly a reinforced concrete structure with EIFS. The roof of the sports hall is hipped. The
Roof construction is designed as an explosive device with wooden trusses and steel tension struts. Buildings for
changing rooms, plumbing, technology, equipment and gallery with a green flat roof.
Exterior building dimensions: approx. 38 x 45 m
Building height: approx. 14 m
masses:
30 m3 waste disposal
ca. 2.300 m2 Grobreinigung
approx. 5,000 m2 of fine cleaning (rooms, sports hall, surfaces, outdoor facilities, façade)
ca. 3.000 m2 Nachreinigung
Events
Execution period : September / October 2023
Construction cleaning: September / October 2023
Construction cleaning hall: September / October 2023